Assessment of the technical potential of hydro resources and development of a map of the layout of small hydroelectric power plants
DOI:
https://doi.org/10.51301/vest.su.2021.i2.05Keywords:
small hydropower, hydropower, hydro turbine, technical potential, hydro resources.Abstract
Hydroelectric resources of small rivers in many regions of our country are very large, the solution of technical issues related to their use is considered, as a rule, from the point of view of comprehensive and rational development of the potential of water flows. For the rational formation of the mode of operation of small hydroelectric power plants, it is necessary to determine the value of its main energy indicators and the value of its change, taking into account the climatic factors of the region in which it is operated. Like any other method of generating electricity by pulverized hydroelectric power plants, it has certain advantages and disadvantages, so the design of these issues needs to be taken into account when carrying out work. The general problems of small hydropower in foreign countries are caused by insufficient research of the hydrological regime and flow of small watercourses and the lack of mass production of equipment. Therefore, in order to prepare the project, it is necessary to determine in advance the relevant technical measures, and these issues were resolved in the preparation work.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 VESTNIK KAZNRTU
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
<div class="pkpfooter-son">
<a rel="license" href="http://creativecommons.org/licenses/by-nc/4.0/"><img alt="Creative Commons License" style="border-width:0" src="https://i.creativecommons.org/l/by-nc/4.0/80x15.png"></a><br>This work is licensed under a <a rel="license" href="http://creativecommons.org/licenses/by-nc/4.0/">Creative Commons Attribution-NonCommercial 4.0 International License</a>.
</div>